1. PROTECT
INVESTMENT IN CURRENT SCHOOLS
Make highest priority upgrades to
address health, safety, modernization and cost savings at all existing
schools. Includes roofing,
seismic upgrades, building security, replacing worn-out fixtures. (See
detail on other side.)
Estimated Cost: $8.8 million |
|
2.
IMPROVE ENERGY EFFICIENCY & REDUCE ENERGY COSTS
Analyze energy use in each building;
replace lighting, windows and upgrade heating/cooling systems.
Estimated Cost: $1.5
million |
|
3a. ACCOMMODATE GROWTH AT Build classrooms; add gym seating;
enlarge music/drama space to serve 150 additional students.
Estimated Cost: $3.7
million |
|
3b. PURCHASE ENOUGH LAND FOR TWO FUTURE SCHOOLS
Purchase land for future schools at
today’s prices, using Land Acquisition Fund and bond proceeds.
Timeline: When available
Estimated Cost: $1.85
million |
|
3c. MID VALLEY ELEMENTARY
Replace 1937 cafeteria and gym with new
cafeteria. Replace covered play area.
Estimated Cost: $2.9
million |
|
3d. WESTSIDE ELEMENTARY
Add three standard-size classrooms; add
bathrooms.
Estimated Cost: $1.6 million |
|
3e. WY’EAST
MIDDLE
Build new music room with performance
seating; remodel current music room (former 1951 auto shop) for
classrooms to replace oldest portable.
Estimated Cost: $2.6
million |
|
3f.
PARKDALE ELEMENTARY
Add new library; convert existing
library to computer lab.
Estimated Cost: $740,000 |
|
3g.
Replace music room (former 1950? bus
barn); add science classroom |
|
3h.
CASCADE LOCKS
Upgrades, including remodeling a
classroom for added science lab
Estimated Cost: $200,000 |
|
CONSTRUCTION BOND LEVY TOTAL
$25.1 MILLION, SAME RATE AS RETIRED
1993 BOND
This bond levy is at the same rate as 2007 property taxes. |
RECOMMENDED UPGRADES FOR MODERNIZATION, SAFETY, EFFICIENCY
Total:
$8.8 million
|
May Street |
Mid Valley |
Cascade Locks K-12 |
|
·
Building
security
·
Replace
windows
·
Energy
efficiency
·
Electrical upgrade
·
·
Improve
acoustics under gym
·
Heating/ventilation
·
Structural repairs |
·
Building
security
·
Replace
windows
·
Energy
efficiency
·
Electrical upgrade
·
Improve
student movement
·
Repair
leak in steam tunnel
·
Heating/ventilation |
·
Building
security
·
Replace
windows
·
Energy
efficiency
·
Electrical upgrade
·
Fire
safety upgrades
·
Conference rooms
·
Upgrade
kitchen & cafeteria
·
Upgrade
bathrooms |
|
Westside |
Pine Grove |
|
|
·
Building
security
·
Energy
efficiency
·
Improve bus & car traffic
patterns at school entrance
·
Replace
gutters
·
Replace
cafeteria flooring |
·
Building
security
·
Replace
windows
·
Energy
efficiency
·
Electrical upgrade
·
Improve
playground
·
Improve
drainage
·
Resurface
gym floor
·
Electrical upgrade |
·
Building
security
·
Energy
efficiency
·
Replace
all wire glass windows (required)
·
Additional parking lot lighting
·
Replace
bleachers; add seats
·
Upgrade
bathrooms |
|
|
Parkdale Elementary |
Wy’east Middle |
|
·
Building
security
·
Replace
windows
·
Energy
efficiency
·
Electrical upgrade
·
·
Flooring
in science classrooms |
·
Building
security
·
Replace
windows
·
Energy
efficiency
·
Electrical upgrade
·
Improve
playground drainage
·
Upgrade
bathrooms
·
Cafeteria
flooring |
·
Building
security
·
Replace
windows
·
Energy
efficiency
·
Electrical upgrade
·
Sinks in
science rooms
·
Remodel
classroom for science
·
Grandstand upgrade for safety
·
A-C in
summer school classrooms
·
Upgrade
kitchen
·
Upgrade
bathrooms |
|
District wide—as needed |
Frankton |
Coe, DO, Transportation |
|
·
Energy
efficiencies
·
Roofing
·
Seismic
upgrades
·
Land for
new schools |
·
Pave
parking lot
·
Replace
gutters
·
Upgrade
electrical |
·
Upgrade
electrical
·
Replace
windows
·
Parking
lot lights |